Modern Floor Wine Bottle Rack in Metal with Stemware

$293.28$879.83

Modern Wine Bottle Holder

  • Wine Bottle Capacity: 13-24
  • Bottle Size Compatibility (L): Standard Size (0.75 L)
 
Clear
Request A Quote

What’s Included

wine rack

wine rack

wine bottle rack

 

Model No.:
BRWRQZ29
Size:
L1000*W300*H2400mm
Color:
Gold | Black
Frame Type:
Metal
Material Details:
Our wine bottle rack made of high quality metal and has high loading capacity Security Guarantee
Style Details
Versatile compartmentalization with hanging position for stemware, inclined bottle placement and symmetrical design
Wine Bottle Capacity
13-24
Bottle Size Compatibility (L)
Standard Size (0.75 L)
Packing:
1.Manufacturer solid wood material classical design wood dining table packed in EPE Foam first.
2. Bubble EPE to protect
3. Plastic bags Water-Proof
4. Cartons to Prevent Cargo clash
5. One container Quantity is perfect to packing
6.We take your package suggestion into consideration & actions.
MOQ:
1x20GP, 1x40HQ
Sampling time:
7 days
Delivery time:
25days

Weights & Dimension

 

Buy Dining Room Sets

Custom Size & design

DimensionsN/A
Size

L1000*W300*H2400mm

Style

Italian, Metal, Morden

Shape

Style 1, Style 2, Style 3, 2 Sets, 3 Sets

Color

Gold, Black

Dining Table Buying Guide

  • Q1: What is the MOQ
A:We don’t technically have minimums, but the smaller the quantity, the higher the transportation price.
  • Q2: Are you factory or trading company?
A:We are a factory with more than 100 workers, and covering 25000 square meters since 2011. We have following workshop: carpentry workshop,polishing workshop,fully enclosed dust-free paint workshop,hardware workshop,assembly workshop,warehouse,factory office and showroom. Our factory is located in Xiamen city, Fujian province, welcome to visit our factory.
  • Q3:What's your mainly business?
A:We are professional in shop display furniture for over 10 years, offering shop & home furniture for watch, cosmetic, clothing, sofa, shelves, bags, shoes, eception desk and so on.
  • Q4: How long is the delivery time?
A: It depends on your project, such as the size of quantity, style and workmanship etc. Generally, the delivery time is within 15-35 days after all materials confirmed.
  • Q5: How do you guarantee the product’s quality?
A: Before production, the pre-production samples will be made for checking details with customers. During the production and packing, there will be professional QC to inspect the products to ensure the products in good quality and correct details.
  • Q6: What’s your payment terms?
A: 30%T/T in advance, 70%T/T balance before delivery. The mass pictures of production and package will be sent to you before delivery. Learn More

You may also like…

Product added
The product is already in the wishlist